1
/
of
4
Yoycol
Be Grateful Women's Curved Hem T-shirt (Plus Size)
Be Grateful Women's Curved Hem T-shirt (Plus Size)
Regular price
$19.99 USD
Regular price
$27.99 USD
Sale price
$19.99 USD
Unit price
/
per
Shipping calculated at checkout.
Product Personalizer
Loading personalization options...
Couldn't load pickup availability
Classic round neck women's T-shirt, curved hem design, summer classic short sleeves, very cool and comfortable.
- Fabric:Jersey(95% polyester and 5% spandex)
- Regular fit
- Short sleeve, crew neck, curved hem.
- Fabric weight: 220g/m²
- Stitch Color: black or white, automatically matched based on patterns.
- Care Instruction: machine wash cold with similar colors, do not bleach, tumble dry low, do not iron, do not dry clean.
- This product is made on demand, with no minimum order quantity.
- Multiple shipping methods available, and fees vary depending on the location and the shipping method selected.
- For custom areas, please refer to the Yoycol mockup generator for details.
- Notice: a variety of factors may cause slight differences between the actual product and the mock-up, including but not limited to colors and precision of elements position.
Size Guide
| inch | L | XL | 2XL | 3XL | 4XL | 5XL |
| Length | 27.4 | 28.0 | 28.5 | 29.1 | 29.7 | 30.3 |
| Bust | 44.9 | 47.2 | 49.6 | 52.0 | 54.3 | 56.7 |
| Sleeve | 9.7 | 10.2 | 10.7 | 11.3 | 11.8 | 12.3 |
| centimeter | L | XL | 2XL | 3XL | 4XL | 5XL |
| Length | 69.5 | 71.0 | 72.5 | 74.0 | 75.5 | 77.0 |
| Bust | 114.0 | 120.0 | 126.0 | 132.0 | 138.0 | 144.0 |
| Sleeve | 24.7 | 26.0 | 27.3 | 28.6 | 29.9 | 31.2 |
This size guide shows product measurements taken when products are laid flat. Actual product measurements may vary by up to 1".
